Piping and modular skids
Hydraulically designed piping networks, manifolds and factory-assembled process skids for RAS facilities.
- Materials
- PVC, PP, stainless steel
- Diameters
- DN32–DN400
- Production time
- 15–40 days
Change piping-and-skids.jpg in the photo of the finished assemblies.
Pipe Systems Engineering
What does the equipment solve?
- Hydraulic calculation and 3D layout of manifolds.
- Selection of fittings for aggressive environments and sterilization.
- Chassis-assembled for quick on-site installation.
- Marking and documentation for service.
Equipment
- Manifolds, valve units, bypasses, valve groups.
- Frames and chassis with vibration mounts and powder coating.
- Factory leak test benches.
- Platform and fasteners for cable routes.
- Data sheets and drawings in IFC/DWG format.
Options and integration
- Thermal insulation and heating cables.
- Automation with electrically driven valves.
- Control devices (flow, pressure, level).