Design, production and launch of turnkey RAS

Pressurised aeration reactor for RAS

The module provides oxygenation of water, removal of CO₂ and nitrogen, and stabilization of pH before supply to pools. The solution is especially effective on high-density farms and when operating ozonizers and biofloc.

Productivity
10–120 m³/h
DO output
up to 130%
Deadlines
30–75 days
Aeration Pressure Reactor Marine Technology

Replace solution-aero-reactor-hero.jpg In the photo of the reactor in production.

Specifications

Water treatment functions

  • Final aeration and oxygen saturation up to 130%
  • Degassing of CO₂ and nitrogen using a cascade scheme
  • pH stabilization by adding alkali/carbonic acid
  • Preparing water before supplying it to pools or biofilters
  • Possibility of integration with ozonizer and UV sterilization

Performance and energy consumption

  • Capacity: 10–120 m³/h (modular assembly)
  • Head loss: 1.5–4.5 m w.c. Art.
  • Energy consumption: 1.1–4.2 kW (including compressor)
  • Oxygen transfer efficiency: ≥ 85%
  • Materials: food grade polypropylene, stainless steel AISI 316

Equipment

  • Reactor vessel with flow distribution
  • Contact plates or high area nozzle
  • Upper and lower gas collection manifolds
  • High pressure oxygenator with rotameter
  • Maintenance hatch, DO/pH/temperature sensors
  • Control panel and alarm system

Options

  • Backup oxygenator for emergency operation
  • Automatic dosing of alkali and acid
  • Built-in heat exchanger for temperature equalization
  • Remote monitoring and data export
  • Compressor noise reduction system

Documentation and service

  • Technological calculation based on initial data
  • Equipment passport and wiring diagrams
  • Operating and maintenance regulations
  • Sensor Calibration Instructions
  • Staff training and technical support 24/7

Integration with your engineering systems

  • Suitable for new and existing RAS. The reactor can be integrated into any water treatment scheme without stopping production.
  • Real-time monitoring. DO, pH and temperature readings are available on the panel and mobile app.
  • Reduce stress in fish and shrimp. We remove CO₂ peaks and stabilize pH, which directly affects growth and immunity.
  • Compactness and service. The unit is delivered assembled, connection takes 1–2 days, access to the units is through service hatches.