Design, production and launch of turnkey RAS
Industrial RAS and aqua farms

Engineering solutions for aquaculture and RAS turnkey

We design, produce and launch farms for growing crayfish, Rosenberg and Vannamei shrimp, sturgeon, trout and other species. Production time is from 30 to 90 days.

Experience
8+ years
Launches
30+ projects
Warranty
Result
RAS farm - engineering solution Marine Technology

Guaranteed quality - from idea to launch

We take responsibility for the result: we design, produce, install and train personnel. We adapt solutions to the area, climate, budget and required volumes.

Integrated approach
From technical specifications and 3D project to launch and support.
Efficiency Guarantee
We confirm the productivity and quality of water with numbers.
Adaptation
For specific types and existing infrastructure.
Support
Staff training and technical support after launch.
Terms 30–90 days
Own production, clear schedule.

Ready solutions

RAS modules designed for the biology of each species.

RAS for giant river prawn

RAS for giant river prawn

Industrial solution with high planting density and automation.

RAS for vannamei shrimp

RAS for vannamei shrimp

We regulate salinity and maintain stable water parameters.

RAS for sturgeon/trout/Clari catfish

RAS for sturgeon, trout and catfish

Universal modules for fish with a closed growing cycle.

Equipment we produce

We select RAS units for your task: from incubation and filtration to automation and remote monitoring.

🔬Incubation and breeding

Incubators for crayfish, shrimp and sturgeon: we maintain temperature, salinity and sanitary treatment.

💧Water filtration and purification
🛡️Disinfection and saturation

Ozone, UV and oxygen - we provide biosafety and emergency reserve.

⚙️Smart technologies and control

Monitoring, biofloc and seawater treatment - 24/7 management with analytics and alarms.

🏗️Infrastructure and Integration

We manufacture pools, pipelines and control panels and deliver them in ready-made blocks.

Full cycle - transparent and on time

  1. Step 1
    Application and consultation

    We determine the goal, type, volumes. Preliminary power calculation.

  2. Step 2
    Design

    3D model, hydraulics, nitrogen balance, specifications, graph.

  3. Step 3
    Production

    Own production of components. Quality control using checklists.

  4. Step 4
    Installation and commissioning

    Installation, startup, calibration of parameters, personnel training.

  5. Step 5
    Escort

    Technical support, service regulations, capacity expansion.

About the company

Marine Technology is an engineering team that does not make “equipment for the sake of equipment”, but working farms. We take on complex tasks, offer clear calculations and are responsible for the results. All systems scale as your business grows.

  • Experience 8+ years
  • 30+ completed projects
  • Terms 30–90 days
  • Post-launch support
Production and assembly of RAS equipment

Let's discuss your farm

Leave your contacts and briefly describe the task: type, desired volumes, room area, budget. We will offer the optimal configuration and timing.